Services
Full-service environmental and geotechnical consulting across 41 states.
Environmental Remediation
Texas's Premier Provider
- Mobile Dual-Phase Extraction (MDPE)
- Groundwater and Soil Remediation System Design, Construction, Installation and Operations & Maintenance
- Quarterly Environmental Monitoring
- Waste Sampling and Characterization
- Skimmer Systems
- Pump and Treat
- Closure and Post-Closure Sampling
- Decommissioning: Sites and Systems
- Mobile Water Treatment Systems/Decontamination
- Excavation
Mobile Dual-Phase Extraction (MDPE)
EE&G, Inc. currently owns and operates a fleet of MDPE trailers. The trailers simultaneously extract liquid and vapor from the subsurface under high vacuum. Upon retrieval from the subsurface, liquid and vapors enter a knockout chamber that separates the two. Liquid is either transferred to storage containers for off-site disposal or routed through EE&G’s water treatment units/trailer for final discharge. Effluent vapors are treated to below applicable permit standards using electric catalytic oxidizers and subsequently discharged to the atmosphere.
Advantages
- Mobile Units — all units are trailer mounted and can target multiple portions of the contaminant plume(s) during events
- High Vacuum — negative vacuum pressures can reach as high as 28 inches of mercury, thus promotes VOC recovery from most geological settings
- Portable Power Source — all trailers run via portable generators
- Enhanced Vapor Recovery — adds Non-Aqueous Phase Liquid (NAPL) to recovery volumes
- Natural Attenuation of contaminant plumes
- Eliminates Long Term, Onsite Maintenance Costs — the all-inclusive mobile unit negates fixed system maintenance costs
- Eliminates Decommissioning Costs
- Large Radius of Influence — most geological settings
- High Efficiency — 300–600 SCFM oxidizers
- Adjustable Groundwater Production — drawdown can be adjusted to accommodate remediation goals and specific hydrogeological needs
- Existing Monitoring/Recovery Well Utilization — units can accommodate monitor wells from 2–6 inches in diameter as extraction points
- Small Footprint with No Disruption of Business — most units require as little as two parking spots to operate; active businesses can remain open and produce revenue during remediation operations
- Setup Time — MDPE systems can be set up and recovering VOCs in as little as one hour
Storage Tank Compliance
- Over/short reporting
- Storage tank operation procedures (STOP)
- Statistical Continuous Automatic Leak Detection (SCALD) Testing
- Automatic Tank Gauge (ATG) Testing
- Contract tank testing procurement and tracking
- Annual line/leak detector testing programs
- Regulatory compliance inspections
- Cathodic protection program development and implementation
- Dispenser calibration tracking
- Tier II filings
- Tank removal programs
- Air permitting
- Reformulated gasoline testing programs
- Regulatory correspondence
- Tank liability insurance procurement
- Incident response
- Real estate acquisition, divestiture and lease agreement management (compliance/environmental)
- Data management
Environmental Consulting
- Real estate transaction assessments — Phase I and Phase II ESAs
- Phase II ESA remedial investigations/feasibility studies
- Environmental compliance audits
- Risk assessments
- Due diligence assessments
- Expert witness testimony
- Site health and safety planning
- Emergency response planning management
- Remedial investigation / feasibility studies
- Remedial action planning
- Spill response and cleanup planning
- Treatment facility design and modification
- Secure and above ground landfills
- Surface impoundments and retention ponds
- Groundwater modeling
- Environmental hazard and risk assessments
- Water well inventory and monitoring
- Hazardous waste studies
- Aquifer pilot studies
Field Services
- Mobile Dual-Phase Extraction (MDPE)
- Leaking Petroleum Storage Tank (LPST) Investigations
- Comprehensive Risk Based Site Assessments (RBA)
- Release Determination Report (RDR)
- Field Investigations
- Monitor Well Drilling
- Waste — wastewater, sludges and soil disposal
- Soils — surface and subsurface sampling
- Water — surface and groundwater sampling
- Quarterly environmental monitoring
- Waste sampling and characterization
- Drinking Water Surveys
- Surface Water and Non-Point Surveys
- Water Well Inventory and Monitoring
- Fluid Evacuation
- Underground Storage Tank (UST) Removal
- Plugging and Abandonment of Monitor Wells
- System De-commissioning
- Closure and post-closure sampling
- Solid and hazardous waste management
- Multi-media environmental audits
Regulatory Support
- Regulatory analysis and permitting
- Environmental impact assessments
- Resource planning and management
- UST closure assessments
- Environmental monitoring and plan preparation
- Waste stream characterization and compliance
- Development of regulatory strategies
- Facility audits of individual or multiple sites
- RCRA permitting and compliance
- Storm Water Pollution Prevention Plans (SWPPP)
- Spill Prevention, Containment & Countermeasure Plans (SPCC)
- Spill & Slug Plans
- Toxic Organic Management Plans (TOMP)
- Air Emission Permitting
- Federal/State Permitting, Planning and Compliance Management
- Multi-Media environmental audits