Skip to content

Services

Full-service environmental and geotechnical consulting across 41 states.

Environmental Remediation

Texas's Premier Provider

  • Mobile Dual-Phase Extraction (MDPE)
  • Groundwater and Soil Remediation System Design, Construction, Installation and Operations & Maintenance
  • Quarterly Environmental Monitoring
  • Waste Sampling and Characterization
  • Skimmer Systems
  • Pump and Treat
  • Closure and Post-Closure Sampling
  • Decommissioning: Sites and Systems
  • Mobile Water Treatment Systems/Decontamination
  • Excavation

Mobile Dual-Phase Extraction (MDPE)

EE&G, Inc. currently owns and operates a fleet of MDPE trailers. The trailers simultaneously extract liquid and vapor from the subsurface under high vacuum. Upon retrieval from the subsurface, liquid and vapors enter a knockout chamber that separates the two. Liquid is either transferred to storage containers for off-site disposal or routed through EE&G’s water treatment units/trailer for final discharge. Effluent vapors are treated to below applicable permit standards using electric catalytic oxidizers and subsequently discharged to the atmosphere.

Advantages

  • Mobile Units — all units are trailer mounted and can target multiple portions of the contaminant plume(s) during events
  • High Vacuum — negative vacuum pressures can reach as high as 28 inches of mercury, thus promotes VOC recovery from most geological settings
  • Portable Power Source — all trailers run via portable generators
  • Enhanced Vapor Recovery — adds Non-Aqueous Phase Liquid (NAPL) to recovery volumes
  • Natural Attenuation of contaminant plumes
  • Eliminates Long Term, Onsite Maintenance Costs — the all-inclusive mobile unit negates fixed system maintenance costs
  • Eliminates Decommissioning Costs
  • Large Radius of Influence — most geological settings
  • High Efficiency — 300–600 SCFM oxidizers
  • Adjustable Groundwater Production — drawdown can be adjusted to accommodate remediation goals and specific hydrogeological needs
  • Existing Monitoring/Recovery Well Utilization — units can accommodate monitor wells from 2–6 inches in diameter as extraction points
  • Small Footprint with No Disruption of Business — most units require as little as two parking spots to operate; active businesses can remain open and produce revenue during remediation operations
  • Setup Time — MDPE systems can be set up and recovering VOCs in as little as one hour
Learn more about MDPE →

Storage Tank Compliance

  • Over/short reporting
  • Storage tank operation procedures (STOP)
  • Statistical Continuous Automatic Leak Detection (SCALD) Testing
  • Automatic Tank Gauge (ATG) Testing
  • Contract tank testing procurement and tracking
  • Annual line/leak detector testing programs
  • Regulatory compliance inspections
  • Cathodic protection program development and implementation
  • Dispenser calibration tracking
  • Tier II filings
  • Tank removal programs
  • Air permitting
  • Reformulated gasoline testing programs
  • Regulatory correspondence
  • Tank liability insurance procurement
  • Incident response
  • Real estate acquisition, divestiture and lease agreement management (compliance/environmental)
  • Data management

Environmental Consulting

  • Real estate transaction assessments — Phase I and Phase II ESAs
  • Phase II ESA remedial investigations/feasibility studies
  • Environmental compliance audits
  • Risk assessments
  • Due diligence assessments
  • Expert witness testimony
  • Site health and safety planning
  • Emergency response planning management
  • Remedial investigation / feasibility studies
  • Remedial action planning
  • Spill response and cleanup planning
  • Treatment facility design and modification
  • Secure and above ground landfills
  • Surface impoundments and retention ponds
  • Groundwater modeling
  • Environmental hazard and risk assessments
  • Water well inventory and monitoring
  • Hazardous waste studies
  • Aquifer pilot studies

Field Services

  • Mobile Dual-Phase Extraction (MDPE)
  • Leaking Petroleum Storage Tank (LPST) Investigations
  • Comprehensive Risk Based Site Assessments (RBA)
  • Release Determination Report (RDR)
  • Field Investigations
  • Monitor Well Drilling
  • Waste — wastewater, sludges and soil disposal
  • Soils — surface and subsurface sampling
  • Water — surface and groundwater sampling
  • Quarterly environmental monitoring
  • Waste sampling and characterization
  • Drinking Water Surveys
  • Surface Water and Non-Point Surveys
  • Water Well Inventory and Monitoring
  • Fluid Evacuation
  • Underground Storage Tank (UST) Removal
  • Plugging and Abandonment of Monitor Wells
  • System De-commissioning
  • Closure and post-closure sampling
  • Solid and hazardous waste management
  • Multi-media environmental audits

Regulatory Support

  • Regulatory analysis and permitting
  • Environmental impact assessments
  • Resource planning and management
  • UST closure assessments
  • Environmental monitoring and plan preparation
  • Waste stream characterization and compliance
  • Development of regulatory strategies
  • Facility audits of individual or multiple sites
  • RCRA permitting and compliance
  • Storm Water Pollution Prevention Plans (SWPPP)
  • Spill Prevention, Containment & Countermeasure Plans (SPCC)
  • Spill & Slug Plans
  • Toxic Organic Management Plans (TOMP)
  • Air Emission Permitting
  • Federal/State Permitting, Planning and Compliance Management
  • Multi-Media environmental audits